Industrial Electrical Contractors for Factories and Plants

From the HT substation to the last machine connection, we get your plant powered, approved and producing on schedule.

The challenge

Your Production Schedule Depends on Your Power

Factories draw heavy loads. Motors, compressors, furnaces and drives all start and stop through the day, and variable frequency drives add harmonics that stress your system. Low power factor turns into penalties on your bill. And a single failed panel can stop an entire line.
On a new plant, there's one more pressure. Machines arrive on a fixed date. If your HT supply, transformer or CEIG approval isn't ready, they sit idle.
What we do

What We Handle for Your Plant

HT supply and substation

HT cabling, VCBs, RMUs and outdoor or indoor substations.

Transformers

Sized for your full production load and your planned expansion.

PCC, MCC and APFC panels

Motor control and power factor correction to avoid penalties.

Machine connections and cable trays

Neat, labelled and easy to maintain.

High-bay and area lighting

Brighter floors at lower running cost with LED.

Earthing and lightning protection

Proper protection for sheds, tanks and sensitive equipment.

DG sets and changeover

Keep critical processes running during grid outages.

Rooftop solar

Factory sheds often have the best roofs for solar

Energy audits and AMC

Planned maintenance during your scheduled shutdowns.

Seamless Execution

Power Solutions for New & Expanding Plants

Setting Up a New Plant

We work backwards from your machine installation date. Load study, HT application, substation, distribution and approvals are all scheduled so your power is live before your equipment arrives.

Expanding an Existing Plant

New lines add load to a system that may already be close to its limit. We audit your current capacity, design the expansion and connect it with the least possible downtime.

Common Questions

Frequently Asked Questions

Yes. We prepare the drawings, handle the Electrical Inspectorate approval and coordinate with TNPDCL or KSEB until your supply is energised.

Yes. An energy audit shows where the penalties come from. Correctly sized APFC panels usually solve them.

Yes. We plan AMC visits and major work around your production calendar.

Setting Up or Expanding a Plant?

Share your machine list and target production date. We'll plan your power around it.